When you buy an existing house, the lender pays the seller the whole purchase price on settlement day and your mortgage starts immediately. When you build, the money flows completely differently: the lender releases the loan in stages, as the builder completes each phase and an independent valuation confirms the work. This is called progress-draw construction finance, and understanding it before you sign a build contract will save you real money and stress.
How progress draws actually work
Instead of one settlement, you have several — often five or six, each tied to a completion stage. A typical structure looks like:
- Land purchase / foundation: the first draw covers the land (if you're buying it separately) or the early groundworks.
- Frame: paid when the frame is up and inspected.
- Lock-up: roof, external walls, windows and doors — the building can be secured.
- Fix-out / fit-out: interior linings, kitchen, bathrooms, electrical and plumbing.
- Practical completion: the final draw, released once the valuation confirms the finished home matches the contracted plans.
Before each draw, the lender typically wants an invoice or progress claim from your builder and, at some stages, an independent valuer's confirmation that the work is worth what's been claimed. Each payment the lender makes is money you start paying interest on, so draw timing matters: the later each draw is released, the less interest you pay during the build.
Worked example (illustrative)
On a staged build with a loan released across five draws, you're not paying interest on the full loan from day one — only on the portion drawn so far. That's usually charged at a variable rate during construction, on an interest-only basis, before converting to a normal principal-and-interest mortgage at completion. Model the finished loan size with the Mortgage Repayments Calculator before you sign anything.
The equity and deposit questions
Lenders still apply normal lending rules to construction loans — you need a deposit, and serviceability is assessed against your income and debts under CCCFA rules like any other mortgage. What's different is what counts as a deposit and how the end-value is treated:
- Your deposit: cash savings, equity in an existing property, or sometimes land you already own unencumbered. What the lender won't accept is a build contract where the total cost already exceeds the end value of the home.
- The end-value check: lenders lend against the projected value of the finished home, which means a build that's over-capitalised for the street — or a contract where costs have blown out — can stall the approval even if you personally could service a bigger loan.
- KiwiSaver: eligible first-home buyers may be able to use KiwiSaver funds towards the deposit; WorthNav's KiwiSaver first-home guide covers the conditions.
Where first-time builders get caught
Construction lending has failure modes that simply don't exist in a standard purchase:
- Cost blow-outs between contract and completion. Variations (changes you request, or things the contract excluded — site works, driveways, landscaping, fencing) are the single biggest budget killer. Get clarity on what the fixed price does and doesn't include before signing. WorthNav's first home guide covers the cost traps.
- The builder's solvency. A draw is money already paid for work not yet done. Check the builder's credentials, ask about progress guarantees, and understand what happens to the contract if the company fails mid-build.
- Interest during the build needs to be budgeted on top of your usual living costs — often while you're also paying rent somewhere else. Getting a realistic picture of both payments at once is exactly what the Borrowing Power Calculator and Mortgage Repayments Calculator are for.
- Timing drag. Consents, weather and contractor availability can stretch a build well beyond the estimate, extending the interest-only period and delaying when your normal mortgage starts. Build slack into your budget, not into your optimism.
What to ask a lender before signing
- What is the interest rate during the construction phase, and does it change at completion?
- How many draws are allowed, and is there a fee per draw or per valuation?
- What documentation is needed at each stage, and how long does approval of each draw take?
- Is the loan interest-only during construction, and when does it convert to principal-and-interest?
- What happens if the build is delayed, or if the final valuation comes in below the contracted cost?
The mortgages category covers the wider NZ home-loan landscape, and WorthNav's first home guide puts construction finance in the context of the whole purchase journey.
The honest summary
A construction loan isn't a different product so much as a different payment rhythm: staged draws against verified progress, interest-only during the build, then a standard mortgage at completion. The three things that protect you are a fixed-price contract you've actually read, a buffer for variations, and a lender who explains the draw process up front rather than after the first invoice arrives.
Your next step
Before you sign a build contract, model the end game: what the finished loan size costs to service per payment in the Mortgage Repayments Calculator, and what you can comfortably borrow given your income and commitments in the Borrowing Power Calculator. Then read the contract's variation clause with the buffer you'll actually need.